Wind Turbine (WTG)
Offshore Substation
Inter-Array Cable
| String | Seg. | WTGs Upstream | I calc (A) | Ampacity (A) | CSA (mm²) | Length (m) | Margin | Status |
|---|---|---|---|---|---|---|---|---|
| Run WS1 topology optimiser first, then size cables. | ||||||||
| CSA (mm²) | Conductor | Segments | Total Length (m) | Total Length (km) | Share (%) |
|---|
| String | Length (km) | Joule Loss (kW) | Diel. Loss (kW) | Total (kW) | % AEP |
|---|---|---|---|---|---|
| Complete WS2 first. | |||||
| Scenario | Load (%) | Joule (kW) | Dielectric (kW) | Total (MW) |
|---|
| String | Length (km) | WTGs | FR (f/yr) | Avg WTGs Lost | E Loss (MWh/yr) | Loss (€/yr) |
|---|---|---|---|---|---|---|
| Complete WS3 first. | ||||||
| Cost Component | Basis | Amount (k€) | % Total |
|---|